Lead (Pb) in Construction
Lead (Pb) Containing Paint Inspection services for single family and commercial building renovation/demolition as required by OSHA’s (L&I) under WAC 296-155-0176.
Waste Profiling (TCLP Sampling)
Waste characterization of debris from a building ventilation or lead abatement project following ASTM standard E 1908-97, as suggested by the WA Department of Ecology.
Design Level Survey and Project Specifications
Design level survey and abatement/remediation specification (02 83 00) for the bid package, including project mediation oversight and closeout documents
Developing Operation and Maintenance Plan (O & M Plan) in order to maintain the lead (Pb) containing material in place and for the use of building maintenance staff.
Contamination Evaluation and Cleanup Plan to determine the extent of the lead (Pb) contamination and develop a cleanup plan to be followed by a certified contractor for safe occupancy of the space.